Welcome: ACE TECHNOLOGY
sales@ace-climatic.com 0086-29-85451431

Bench Top Drying Oven

EMAIL

Summary

The ACE-9023A Forced air drying oven is mainly used for scientific research units, specialty universities, laboratories, industrial mining enterprises etc and production field for materials drying and heat treatment.

Features

1.This forced air drying ovenadopts high quality cold rolled steel sheet, with strong rust resistance. The inner material is stainless steel, easy cleaning. 

2.Reasonable hot air circulation channel is designed in the cabinet, so that the temperature distribution in the cabinet is more even, temperature rise faster. Equipped with adjustable air outlet, for adjusting the in and out of the air in the cabinet. And also canoutput the bad air with connecting a pipe outside work place.

3.Temperature control is microcomputer intelligent digital technology controller with PID function and LED display.


Model

ACE-9023A

Source Voltage

110V/220V50Hz/60Hz

Power

750W

Warranty

TWOYears limited warranty with lifetime support

Interior Dimension

300*300*270mm[Many Other Sizes Available]

Exterior Dimension

500*450*440mm

Temperature Range

RT+10250

Temperature resolution

±0.1

Temperature fluctuation

±0.5

Temperature controller

Dual screen fourbit digital temperature controller.

Self tuning function.The timing time can up to 9999 minutes

Inner box material

High quality mirror stainless steel plate,round shape,smooth surface,easy to clean

Outside material

High quality cold-rolled steel plate,the surface electrostatic spray,

hard and firm coat,with strong anti rust ability

Sensor

A grade PT100 Platinum resistance

Heat pressure layer

High quality insulation system,inner box,inner shell,ultra-fine glass fiber,

Aluminum foil aluminum reflector,air-interlayer from inside to outside

Observe Window

The oven door are provided with double-layer tempered glass observation window,

can observe the test result easily

Heating mode

Electric heating.Nickel chromium alloy electric heater

Safety installation

With overtemperature protection,grounding etc.

Wind duct

Forced air circulation channel,ensure that the workroom uniform temperature;

air duct provided with a heater,temperature sensor

Adjustable air intake

The control box and outlet air quantity,the casing is provided with and exhaust,

Can close or adjust discharge mouth to change wind effect.

Shelf

2pcs

Timingrange

1-9999mins





INQUIRY